Planning And Development Development Permission Application

Regulation 8 of the Physical Planning (Development Permission) Regulations, 2021

Published
November 27, 2026
ID
TCI-177-66-038
Authority
Department of Planning
PDF Pages
22

Summary

Public notice of Pelican Energy TCI Ltd’s application for outline development permission for an 8MW photovoltaic array, battery energy storage system and microgrid on Block and Parcel 50305/41, with an invitation to make representations within 28 days of publication.

Entities (5)

NameTypeRolesRegistration IDs
Pelican Energy TCI Ltd company development permission applicant —
Department of Planning government_agency recipient of development permission application, channel for written representations —
Director of Planning government_agency recipient of written representations —
Physical Planning Board government_agency board to consider the application, video-conference representation venue —
Secretary of Physical Planning Board government_agency contact for video-conference representations —

Land Parcels (1)

ReferenceBlockParcelIslandSectionAcreage
50305/41 50305 41 North Caicos — 22.17

Events (2)

  • Date unknown
    development_permission_application
    Status: submitted for consideration; permission not stated as granted
    Authority: Department of Planning
  • November 27, 2026
    public_notice_and_invitation_for_representations
    Status: representations invited
    Authority: Department of Planning

Legal Authorities

Physical Planning (Development Permission) Regulations, 2021 regulation
Section Regulation 8 (2021)
Relationship: cited

Deadlines

December 25, 2026
within twenty-eight (28) days of publication of this Notice unverified

Relationships

SubjectRelationshipObjectType
entity-1 applied_for application-NC1350 explicit
application-NC1350 concerns_site parcel-50305/41 explicit
application-NC1350 submitted_to entity-2 explicit
entity-4 will_consider application-NC1350 explicit

Full Text

NOTICE Regulation 8 of the Physical Planning (Development Permission) Regulations, 2021 AN APPLICATION, REGISTERED NC1350, BY PELICAN ENERGY TCI LTD FOR OUTLINE DEVELOPMENT PERMISSION FOR THE PROPOSED CONSTRCUTION OF A PHOTOVOLTAIC ARRAY (8MW), BATTERY ENERGY STORAGE SYSTEM (BESS) AND MICROGRID ON BLOCK & PARCELS 50305/41 WHICH IS APPROXIMATELY 22.17 ACRES OF LAND LOCATED AT WADES GREEN, KEW, NORTH CAICOS. THE PROPOSED DEVELOPMENT FALLS WITHIN A CATEGORY OF DEVELOPMENT THAT REQUIRES PUBLIC ADVERTISEMENT. IN ADDITION, THE SITE IS CURRENTLY DESIGNATED RESIDENTIAL LOW DENSITY B UNDER THE NATIONAL PHYSICAL DEVELOPMENT PLAN (2020), AND THE PROPOSED USE IS INCONSISTENT WITH THE ZONING DESIGNATION APPLICABLE TO THE SUBJECT PARCELS. This application has been submitted to the Department of Planning for consideration of Development Permission on BLOCK & PARCELS 50305/41 WHICH IS APPROXIMATELY 22.17 ACRES OF LAND LOCATED AT WADES GREEN, KEW, NORTH CAICOS. Anyone wishing to make representation(s) may do so in writing to the Director of Planning, South Base, Grand Turk or through the Department of Planning, Emily House, Leeward Highway, Providenciales, within twenty-eight (28) days of publication of this Notice. You may also make representation(s) via video conferencing at the sitting of the Physical Planning Board when this application would be considered. If you are desirous so to do via video conferencing, contact the Secretary of Physical Planning Board. Dated 29th

Extraction Warnings

  • ⚠ The supplied notice text ends at “Dated 29th”; the date is incomplete, so the signing date cannot be determined.
  • ⚠ The deadline date 2026-12-25 is calculated as 28 days after the supplied publication date; the notice does not state a method for counting days, so the calculated date is unverified.
  • ⚠ The source text spells “CONSTRCUTION”; preserved as printed in the evidence text and not silently corrected.
  • ⚠ No linked supplements were supplied.
Source: TCI Government Gazette Vol. 177, No. 66, published November 27, 2026. This is a research tool — verify information with authoritative sources before relying on it.