Planning And Development Development Permission Application

Regulation 8 of the Physical Planning (Development Permission) Regulations, 2021

Published
November 13, 2026
ID
TCI-177-63-026
Authority
Department of Planning
PDF Pages
17

Summary

Public notice of Pelican Energy TCI Ltd’s application NC1350 for outline development permission for a proposed 8MW photovoltaic array, battery energy storage system and microgrid on Block and Parcel 50305/41, with representations invited within 28 days of publication.

Entities (5)

NameTypeRolesRegistration IDs
Pelican Energy TCI Ltd company applicant —
Department of Planning government_agency recipient of application, recipient of written representations —
Director of Planning government_agency recipient of written representations —
Physical Planning Board government_agency board at whose sitting the application would be considered —
Secretary of Physical Planning Board government_agency contact for arranging video-conference representations —

Land Parcels (1)

ReferenceBlockParcelIslandSectionAcreage
50305/41 50305 41 North Caicos — 22.17

Events (2)

  • Date unknown
    development_permission_application
    Status: submitted to the Department of Planning for consideration; no decision stated
    Authority: Department of Planning
  • November 13, 2026
    public_notice_and_representation_invitation
    Status: representations invited
    Authority: Department of Planning

Legal Authorities

Physical Planning (Development Permission) Regulations regulation
Section Regulation 8 No. 8 (2021)
Relationship: cited

Deadlines

December 11, 2026
within twenty-eight (28) days of publication of this Notice unverified

Relationships

SubjectRelationshipObjectType
entity-1 submitted_application_to entity-2 explicit
entity-1 applied_for_development_permission_concerning parcel-50305/41 explicit

Full Text

NOTICE Regulation 8 of the Physical Planning (Development Permission) Regulations, 2021 AN APPLICATION, REGISTERED NC1350, BY PELICAN ENERGY TCI LTD FOR OUTLINE DEVELOPMENT PERMISSION FOR THE PROPOSED CONSTRCUTION OF A PHOTOVOLTAIC ARRAY (8MW), BATTERY ENERGY STORAGE SYSTEM (BESS) AND MICROGRID ON BLOCK & PARCELS 50305/41 WHICH IS APPROXIMATELY 22.17 ACRES OF LAND LOCATED AT WADES GREEN, KEW, NORTH CAICOS. THE PROPOSED DEVELOPMENT FALLS WITHIN A CATEGORY OF DEVELOPMENT THAT REQUIRES PUBLIC ADVERTISEMENT. IN ADDITION, THE SITE IS CURRENTLY DESIGNATED RESIDENTIAL LOW DENSITY B UNDER THE NATIONAL PHYSICAL DEVELOPMENT PLAN (2020), AND THE PROPOSED USE IS INCONSISTENT WITH THE ZONING DESIGNATION APPLICABLE TO THE SUBJECT PARCELS. This application has been submitted to the Department of Planning for consideration of Development Permission on BLOCK & PARCELS 50305/41 WHICH IS APPROXIMATELY 22.17 ACRES OF LAND LOCATED AT WADES GREEN, KEW, NORTH CAICOS. Anyone wishing to make representation(s) may do so in writing to the Director of Planning, South Base, Grand Turk or through the Department of Planning, Emily House, Leeward Highway, Providenciales, within twenty-eight (28) days of publication of this Notice. You may also make representation(s) via video conferencing at the sitting of the Physical Planning Board when this application would be considered. If you are desirous so to do via video conferencing, contact the Secretary of Physical Planning Board. Dated 29th

Extraction Warnings

  • ⚠ The supplied notice text ends abruptly at “Dated 29th”; the remainder of the signing date is missing, so the notice_date cannot be determined.
  • ⚠ The notice text contains the apparent source spelling “CONSTRCUTION”; it has been preserved in evidence and not silently corrected.
  • ⚠ The supplied source contains only the notice text for PDF page 17; no linked supplements were supplied.
  • ⚠ The calculated representation deadline of 2026-12-11 uses 28 calendar days after the stated publication date; the notice does not specify a day-counting convention, so the precise legal deadline is unverified.
Source: TCI Government Gazette Vol. 177, No. 63, published November 13, 2026. This is a research tool — verify information with authoritative sources before relying on it.